Western Price List

Details about pricing and service for Western Ontario.

2025 General Contractors Price List – Western Region

All mixes are performance based, using type GU Portland and supplementary cementitious products. CBM reserves the right to increase prices due to project type and / or volume requirements. Prices are in effect starting January 1, 2025.

Ready-Mix Concrete

CSA Specification Mixes
Maximum 100mm slump.

Class / Exposures ​ Min. Strength / W/C Ratio Price/m3
C-4 F-2 / A4
25 MPa 0.55 W/C
$279.00
C-3 F-1 S-3 / A3
30 MPa 0.50 W/C
$288.00
C-2 S-2 / A2
32 MPa 0.45 W/C
$295.00
C-1 S-1​ / A1
35 MPa 0.40 W/C <1500 Coulombs
$303.00
C-XL
50 MPa 0.40 W/C /56 days <1000 Coulombs incl. EasyFlow HR
$383.00

OPSS Mixes
Prices include water reducing and air entraining agents.

Strength Price/m3
15 MPa 20mm Aggregate
$273.50
20 MPa 20mm Aggregate
$284.50
25 MPa 20mm Aggregate
$289.50
30 MPa 20mm Aggregate
$298.00
35 MPa 20mm Aggregate
$317.00

Indutrial Floor Mix

Strength Price/m3
25 MPa 0.55 W/C Ratio incl. EasyFlow MR
$294.00
Includes 20mm Aggregate. Minimum 120+30 slump.

High Performance Mix

Strength Price/m3
50 MPa
$383.00
Includes T10SF Cement and EasyFlow HR

Strength Mixes
Includes 20mm Aggregate. Maximum 100mm Slump.

Strength Price/m3
10 MPa
$252.00
15 MPa
$256.00
20 MP​a
$264.00
25 MPa
$269.00
30 MPa
$280.00
35 MPa
$292.00
40 MPa incl. EasyFlow MR
$330.00

Residential Mixes

Strength Mix Price/m3
15 MPa 0.70 W/​​C
150mm Slump Maximum Wall
$261.00
20 MPa 0.70 W/​​C
150mm Slump Maximum Wall
$266.​50
25 MPa 0.65 W/​C
OBC Basement Floor
$272.00
32 MPa 0.45 W/C
OBC Garage Floor
$295.00

Lean Mixes
Includes 20mm Aggregate. Maximum 100mm Slump.

Strength Mix Price/m3
0​.4 ​MPa U fill
150mm Slump Maximum Wall
$239.00
0.7 MPa
150mm Slump Maximum Wall
$241.00
5.0 MPa
$248.00
8.3 MPa
Conduit mix (10mm aggregate)
$253.00

Caisson Mixes
Includes 20mm Aggregate. Maximum 150mm Slump.

Strength Price/m3
0.4 MPa Piling Mix
$239.00
2 M​Pa
$248.00
20 MP​a
$274.00
25 MPa
$281.00
30 MPa
$290.00

Pump Grout Mixes

Strength Price/m3
35 MPa
$400.00​
3​0 MPa
$380.00
25 MP​a
$355.00
20 MPa
$345.00
15 MPa
$335.00
10 MPa
$325.00

Special Aggregate Mixes

type Price/m3
10mm Stone
$20.00
10mm Round Pea Stone
$25.00
Quarry Sto​ne
$23.00
Light Weight, Traprock
Upon Request

COD Orders
Price on Request

COST RECOVERY CHARGES

Environmental Charge Price/m3
$7.00
TOARC/MPAC Charge Price/m3
$1.00
Sarnia Safety Surcharge Price/m3
Chemical Valley
$10.00
Concrete Cooling-Ice Price/m3
Concrete temperatures 26°C to 30°C
$80.00
Concrete temperatures 25°C and under
$100.00
Pour cancellation / restocking
As per quote
Winter Handling Price/m3
November 1 – April 30 inclusive​​​
$22.00
Conveyor Rentals Price/load
$300.00

After Hours Delivery
Regular hours: Monday to Friday 7 am to 5 pm.
For completion of deliveries started between 7 am and 5 pm:

Price/m3
After 5 pm and before 9 pm
$30.00
After 9 pm and before 7 am
$60.00 + Plant Opening
Saturday deliveries
$30.00 + Plant Opening
Plant Opening; deliveries from 7 pm to 6 am
$4000.00 Flat Rate
Each truck required
$2500.00
Restricted Load Charge Price/load
When Highway Traffic Act or Municipal restrictions are in effect, a Restricted Load Charge will apply
$350.00
Pour Cancellation Charge / Rescheduling Charge
$200 per RMTO. $600 minimum charge.

Minimum Delivery Charge
One part load allowed to finish pour on orders exceeding 7 m3. The minimum load size is 1 m3.

Price/load
Load sizes 4 m3 – 3.2 m3
$175.00
Load sizes 3 m3– 1.2 m3
$300.00
Load sizes 1 m3
$400.00

Additional Waiting/Unloading Time
90 minutes per load will be allowed for unloading. Additional time will be charged at $2.00 per minute.

Price/hour
$120.00
Trial Batch & Test Cylinders Price/mix
$880.00
Linear Shrinkage Testing Price/test
$2,750.00
Rapid Chloride Permeability Testing (RCP) Price/test
$2,200.00
Air Void System (AVS) Price/test
$1,100.00
Price/m3
Federal Carbon Charge
$2.90
All concrete prices are subject to a $15.00 / m3 escalator each January 1st.
Fuel Surcharge $2.00/m3
FLEX FUEL SURCHARGE: Pricing per index. ​Visit www.canadabuildingmaterials.com, Be a Customer
Taxes Extra
Subject to any further increase by reason of government legislation.
Harmonized Sales Tax (HST)
13%
Chute Washout Price/m3
Where Applicable
$3.00

Terms

Prices on ready–mixed concrete are net and due for payment on or before thirty days after date of invoice. On overdue accounts, interest at 1.5% monthly (18% per annum) will be charged. The above prices are firm only if covered by a written quotation and are subject to ​terms and conditions thereon.

ConcreteSolutions Products

RustGuard/Corrosion Inhibitors Price/litre
$5.00
DelaySet Price/m3
6 hour set retarding
$20.00
2 hour set retarding
$16.00

EasyFlow

Range Price/m3
Extended. Max. 230mm slump
$30.00
High. Max. 190mm ​slump
$20.00
Mid. Max. 150mm slump
​ $16.00
FiberMaxMI Price/m3
$22.00
FiberMaxFI Price/m3
$22.00
FiberMaxMA Price/m3
Upon Request
Re-Pel / Silica Fume Price/m3
CBM specification
Upon Request

Special Cement Mixes

Type Price/m3
Type 30 High Early (HE)
$30.00
Type 20 & 50 Equivalent (MS, MH & HS)
Upon Request
Type 20 & 50 Equivalent
Upon Request

First-Up
Prices / m3. 75%* of 28 day strength in:

Strength 24 hours 48 hours 72 hours
20 MPa
ADD
$51.00
$44.00
$38.00
25 MPa
ADD
$53.00
$46.00
$40.00
30 MPa
ADD
$55.00
$48.00
$42.00
35​ MPa
ADD
$57.00
$50.00
$44.00
40​ MPa
ADD
$62.00
$52.00
$46.00
35 MPa
ADD
$63.00
$55.00
$48.00
*Based on proper curing temperatures in accordance with CSA requirements.
Jump Start Price/m3
$22.00
Get-Set Price/m3
Get-S​et 1 (10°C to 8°C)
$35.00
Get-Set 2 (7°C to 5°C)
$40.00
Get-Set 3 (4°C to -1​°C)​
$47.00
Get-Set 4 (-2°C to -7°C)
$60.00
Pump Mix Price/m3
$15.00
Colours of Distinction Upon Request
Colour washout
$150.00 / load
Calcium Chloride Price/m3
1%
$8.00
2%
$12.00

YOUR GUIDE TO QUALITY CUSTOMER SERVICE

Our goal is to provide quality products, delivered on time and in a courteous manner while allowing flexibility to you, our valued customer.

Ordering Guidelines

CBM is committed to providing QUALITY and SERVICE on all Ready–Mixed Concrete orders.

We believe that the ability of our customers to effectively schedule concrete orders is critical to on-time delivery. In order to serve our customers better, we have created a set of ORDERING GUIDELINES.

By issuing these guidelines, we will endeavor to meet your service expectations by making the most effective use of our people and equipment.

  • Advance notice – In order to provide the best possible service, we encourage customers to place orders by 12:00 noon the day before the concrete is required.
  • Quantity & rate – When you are placing an order, we must know the quantity of concrete that will be used on a particular pour, and the required pour rate in cubic metres per hour.
  • Radio orders – We discourage orders over the radio or to sales staff. If this is necessary we, Upon Request, that the order be confirmed by telephone on the same day as the order is placed. (Balance orders will be accepted over the radio).
  • On call orders – will be scheduled when confirmed and as the existing workload permits.
  • Cancellation of orders – will only be possible if the truck is not yet loaded.
  • Keep us informed – Prompt notification to dispatch is necessary if there are changes or delays to your original order.

Our Commitment

  • We will always endeavor to be on the job at the scheduled time.
  • Once a pour is started, our dispatchers are committed to keeping the customer supplied with concrete until the original order is finished. A balance to the original order will be shipped in a timely fashion. Additional metres will be supplied as scheduling permits.
  • All orders will be taken only by the Plant Manager or Dispatcher who will do everything possible to work the order in at an acceptable time.
  • Delivering a quality product with exceptional service is our daily goal.

Dispatch Hours

  • Hours for ordering concrete are 7:00 am to 5:00 pm Monday to Friday.
  • Orders taken before 7:00 a.m and after 5:00 pm will be scheduled as truck availability permits.

Just a Reminder

  • Proper site preparation and organization are essential to Quality Service.
  • It is the customers responsibility to provide qualified flagmen and bucket personnel.
  • Excessive concrete returns are a hindrance to providing our customers with good service.